Highway Railway Beam Construction Bridge Girder Erecting Machine

China 
                Highway Railway Beam Construction Bridge Girder Erecting Machine
             supplier

Highway Railway Beam Construction Bridge Girder Erecting Machine image

Get a Quote Email to us

Basic Info.

Model NO.
JQJ

Type
Ordinary

Lifting Speed
0.1-1m/Min

Trolley Longitudinal Speed
3m/Min

Trolley Cross Speed
3m/Min

Crane Longitudinal Speed
3m/Min

Crane Cross Speed
3m/Min

Application
Highway/Railway

Industrial Voltage
3AC 220V~480V 50/60Hz

Structure
Truss

Warranty
1 Year

Color
Customized

Transport Package
Special Waterproof Plastic Close for Expor, 40hc

Specification
200 ton

Trademark
NYBON

Origin
Henan, China

HS Code
84261120

Production Capacity
100 Sets/Year

Product Description

Highway railway beam construction bridge girder erecting machine 

Description: 

Highway railway beam construction bridge girder erecting machine is bridge crane that places precast concrete beam into precast pier. And it consist of main girder,front leg, middle leg, rear leg, rear auxiliary leg, lifting trolley, hydraulic system and electrical device.

Detail Pictures:

Main technical parameter:

Span
 
50m 40m 30m
Type QJ200/50 QJ180/50 QJ160/50 QJ140/40 QJ120/40 QJ100/30 QJ80/30
Rated capacity 200t 180t 160t 140t 120t 100t 80t
Bridge span 30~50m 20~40m 20~30m
Max.slope longitudinal slope ≤5%               Cross slope ≤5%
Lifting speed 0.41m/min 0.45m/min 0.5m/min 0.56m/min 0.65m/min 0.75m/min 0.9m/min
Trolley longitudinal speed 3m/min
Trolley cross speed 3m/min
Crane slide longitudinal travel speed 3m/min
Crane slide cross travel speed 3m/min
Adaptive inclined bridge angle 0~45°
Adaptive curved bridge  radius 400m 300m 200m

Crane hole principle diagram:

Process description:

1,Installate the launcher,check the functioning of the institutions, subject to normal after the main girder leveling, and place the girder to end of launcher;

2,Lift the front legs and rear leg , so that the main beam elevated and middle leg lift off ground, and then move the middle leg front. And move the two trolley rear;

3,Loose front leg and rear leg, let middle leg and rear leg support the main girder and leveling main girder again and then move it to fron about 35m;

4,Front trolley lift bridge girder at the end and make flat bed support the other end, which can make the main girder front movement steady;

5,Move the main girder as well as the flat bed front 10m, then make front leg touch new pier and suppout the main girder again. And then finish the work of launch the girder.Erection schematic diagram of side beam

Erection principle diagram of Side beam:
 


Process instructions

1,Place first girder to second gider position;

2,Move launcher, make center line of outer main girder conicide with that of first girder;

3,Move the trolley to most left side, and then lift the girder off ground.

4,The whole launcher move to position of first girder, then lay down the girder.

Application:

Bridge girder erection machine is suitable for highway and railway bridge, such as straight bridge, skew bridge, curved bridge and so on.

 

We are China Highway Railway Beam Construction Bridge Girder Erecting Machine manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.

Tags: , ,

FAST AND RELIABLE SERVICE FOR YOUR PROJECT

Contact our trained experts today to find your perfect crane solution.

ASK A QUESTION